Steel Division - Divisions - Home
 

Tafseer has launched Steel Fabrication & Erection Division from 2009, mainly to meet out the requirement of its Own Projects especially for design and fabricate the Structural Steel Buildings / Industrial Facilities in the First Phase and the expansion program is on the card to take up more external Projects in the Second Phase. This division has qualified and well experienced team members in the fabrication and execution of the works.

RANGE OF PRODUCTS:

  • Hot Rolled Structural Steel (Supply & Erection)
  • High Quality Steel Profiled Sheets (Erection)
  • Hot Dip Galvanized Z &C Purlin (Erection)
  • Polyurethane-Injected Sandwich Panels (Erection)

PRINCIPLES OF FABRICATION & ERECTION OF STRUCTURAL STEEL

TAFSEER STEEL DIVISION is carrying out its Scope of Work based on its well Tested & Proved Method of Statement

ISO 9001: 2008 CERTIFIED

ISO 14001: 2004 CERTIFIED

OHSAS 18001 : 2007 CERTIFIED


LIST OF MACHINERIES


S.NO. EQUIPMENT NAME

TOTAL

1 ROLLER BENDING MACHINE 1
2 PRESS BRAKE 1
3 PLATE SHEARING MACHINE 1
4 POWER PRESS 3
5 ARC WELDING MACHINE 27
6 MIG WELD MACHINE 2
7 DRILLING MACHINE 8
8 MILLING MACHINE 1
9 LATHE MACHINE 8 FT 1
10 CHASER MACHINE 3
11 AUTO GAS CUTTING 1
12 GAS CUTTING SET   11
13 FORKLIFT (10 TON) 1
14 IRON WORKER (25TON) 1
15 SHOT BLASTING MACHINE   1
16 AIRLESS PAINTING MACHINE   1
17 COMPRESSOR   1
18 MOBILE CRANE (50T)   1
19 GRINDERS 4 “ & 9”   30

PROJECTS COMPLETED


S.NO DESCRIPTION OF WORK

NAME OF THE PROJECT

STATUS

1 Foot Bridges, Al Ain White Water Rafting , Al Ain COMPLETED
2 Lifting Beam White Water Rafting , Al Ain COMPLETED
3 Epoxy Steel Gate White Water Rafting , Al Ain COMPLETED
4 G.I Stair for Surf Pool Al Ain White Water Rafting , Al Ain COMPLETED
5 Ladder White Water Rafting , Al Ain COMPLETED
6 Yas Island P.S fencing work 2km Yas Island Police Station Project COMPLETED
7  Yas Island Police Station Project Yas Island Police Station Project COMPLETED
8 Central Store Maintenance & Workshop A l Reem Camp COMPLETED
9 Temporary Kitchen at Reem camp A l Reem Camp COMPLETED
10 Safety barrier for Watani Villa-I Al Watani Villa Project, Abu Dhabi COMPLETED
11 Access ladder for scaffolding Al Watani Villa Project, Abu Dhabi COMPLETED
12 Cage ladder for Yas Island Yas Island Villa Project COMPLETED
13 Steel brackets for Royal group Royal group  Building COMPLETED
14 Dewatering Settling tank Hydra  Avenue Projects COMPLETED
15 G+7 Stair handrail  G+7 Building at Musafa, Abu Dhabi COMPLETED
16 G+7 Cage ladder + DB cover  G+7 Building at Musafa, Abu Dhabi COMPLETED
17 Steel gate for U Shape villa, Mina 3 Mina Villa Projects, Abu Dhabi COMPLETED